NAIM’s mega slab and first columns ready

August 15, 2018

The mega structure responsible for supporting the terminal building has been completed. At the same time the first 4 columns are already raised at the center of the terminal, in total these 21 conical structures will shape the roof of the airport. Allowing the entry of natural light and capturing rainwater.